Allied-telesis AT-SBx81CFC960 Uživatelský manuál Strana 115

  • Stažení
  • Přidat do mých příruček
  • Tisk
  • Strana
    / 322
  • Tabulka s obsahem
  • ŘEŠENÍ PROBLÉMŮ
  • KNIHY
  • Hodnocené. / 5. Na základě hodnocení zákazníků
Zobrazit stránku 114
SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation Guide
Section II: Installing the Chassis 115
Installing the AT-SBxPWRPOE1 PoE Power Supply
This section contains the installation procedure for the AT-SBxPWRPOE1
Power Supply, for the PoE+ ports on the AT-SBx81GP24 PoE Line Card.
For background information, refer to “AT-SBxPWRPOE1 Power Supply”
on page 30.
Caution
The electronic components in the AT-SBxPWRPOE1 PoE Power
Supply can be damaged by electro-static discharges (ESD). Follow
the procedure in “Protecting Against Electrostatic Discharge (ESD)”
on page 108 to guard against ESD damage when unpacking and
installing the power supply.
To install the power supply, perform the following procedure:
1. Choose a slot for the AT-AT-SBxPWRPOE1 System Power Supply in
the chassis.
You may install it in either slot A or B, shown in Figure 47 on page 109.
2. Raise the handle on the blank panel covering the selected slot and
slide the panel from the chassis. Figure 54 on page 116 shows the
blank panel being removed from slot A.
Zobrazit stránku 114
1 2 ... 110 111 112 113 114 115 116 117 118 119 120 ... 321 322

Komentáře k této Příručce

Žádné komentáře