Allied-telesis x900 Series Switch and SwitchBlade x908 Expansion Uživatelský manuál Strana 8

  • Stažení
  • Přidat do mých příruček
  • Tisk
  • Strana
    / 31
  • Tabulka s obsahem
  • KNIHY
  • Hodnocené. / 5. Na základě hodnocení zákazníků
Zobrazit stránku 7
Expansion Modules
8
For the latest list of approved XFP transceiver modules, contact your authorised
Allied Telesis distributor or reseller. See the most current revision available of
the XEM datasheet (document number 617-000034) for further information
about which XFP transceiver modules are approved for use with the XEM-1XP.
Caution Allied Telesis recommends waiting 30 seconds after hot swapping
any XEM before resuming normal operations. The switch must fully complete
the bootup process before you can hot swap any XEM. Also ensure the XEM
fastening thumbscrews are fully tightened. If you are unsure about correct
procedures, contact your authorised Allied Telesis distributor or reseller.
XEM_IG.fm Page 8 Wednesday, May 30, 2012 9:24 AM
Zobrazit stránku 7
1 2 3 4 5 6 7 8 9 10 11 12 13 ... 30 31

Komentáře k této Příručce

Žádné komentáře