Allied-telesis x510 Series Uživatelský manuál Strana 68

  • Stažení
  • Přidat do mých příruček
  • Tisk
  • Strana
    / 90
  • Tabulka s obsahem
  • ŘEŠENÍ PROBLÉMŮ
  • KNIHY
  • Hodnocené. / 5. Na základě hodnocení zákazníků
Zobrazit stránku 67
Chapter 4: Cabling the Networking Ports
68
6. Verify the position of the handle on the SFP transceiver. If the
transceiver is in a top slot, the handle should be in the upright position,
as shown in Figure 27. If the transceiver is in a bottom slot, the handle
should be in the down position.
Figure 27. Positioning the SFP or SFP+ Handle in the Upright Position
7. Connect the fiber optic cable to the transceiver, as shown in Figure 28.
The connector on the cable should fit snugly into the port, and the tab
should lock the connector into place.
Figure 28. Connecting a Fiber Optic Cable to an SFP or SFP+ Transceiver
8. Repeat this procedure to install additional transceivers.
SFP Handle
Zobrazit stránku 67
1 2 ... 63 64 65 66 67 68 69 70 71 72 73 ... 89 90

Komentáře k této Příručce

Žádné komentáře