Allied-telesis AT-MCF2000M Uživatelský manuál Strana 55

  • Stažení
  • Přidat do mých příruček
  • Tisk
  • Strana
    / 70
  • Tabulka s obsahem
  • ŘEŠENÍ PROBLÉMŮ
  • KNIHY
  • Hodnocené. / 5. Na základě hodnocení zákazníků
Zobrazit stránku 54
AT-MCF2000M Management Module Installation Guide
55
Verifying the Installation
This procedure verifies the installation of the
AT-MCF2000M Management Module. The procedure
assumes the chassis with the module is powered on.
To verify the installation of the module, perform the
following procedure:
1. Verify that the Power LED on the module is green.
2. If you connected a network cable to the 10/100/
1000Base-T Management Module, verify that the L/A
(Link/Activity) LED is green or amber.
3. If you connected a cable to the Stack port, the Link/
Activity LED for the port should be steady or flashing
green.
Note
If there are any problems, refer to Chapter 3,
“Troubleshooting” on page 63 for assistance.
Zobrazit stránku 54
1 2 ... 50 51 52 53 54 55 56 57 58 59 60 ... 69 70

Komentáře k této Příručce

Žádné komentáře