Allied-telesis AT-IX5-28GPX Uživatelský manuál Strana 59

  • Stažení
  • Přidat do mých příruček
  • Tisk
  • Strana
    / 129
  • Tabulka s obsahem
  • ŘEŠENÍ PROBLÉMŮ
  • KNIHY
  • Hodnocené. / 5. Na základě hodnocení zákazníků
Zobrazit stránku 58
x510 Series Installation Guide for Virtual Chassis Stacking
59
Unpacking the Switch
Figure 16 lists the items that come with the switch. If any item is missing or
damaged, contact your Allied Telesis sales representative for assistance.
Figure 16. Components of the switch
Note
You should retain the original packaging material in the event you
need to return the unit to Allied Telesis.
After checking the contents of the shipping containers, go to Chapter 4,
“Installing the Switch and its Power Supplies” on page 61
1947
Two rack mounting brackets
One 2 m (6.6 ft) local management cable with
RJ-45 (8P8C) and DB-9 (D-sub 9-pin)
connectors.
2047
Twelve rack mounting bracket
screws
AT-PNL800/1200
One AT-PLN800/1200 blank panel for
covering an empty power supply bay
Zobrazit stránku 58
1 2 ... 54 55 56 57 58 59 60 61 62 63 64 ... 128 129

Komentáře k této Příručce

Žádné komentáře