Allied-telesis AT-IX5-28GPX Uživatelský manuál Strana 115

  • Stažení
  • Přidat do mých příruček
  • Tisk
  • Strana
    / 129
  • Tabulka s obsahem
  • ŘEŠENÍ PROBLÉMŮ
  • KNIHY
  • Hodnocené. / 5. Na základě hodnocení zákazníků
Zobrazit stránku 114
IX5-28GPX Installation Guide
115
6. Verify the position of the handle on the SFP transceiver. If the
transceiver is in a top slot, the handle should be in the upright position,
as shown in Figure 67 on page 115. If the transceiver is in a bottom
slot, the handle should be in the down position.
Figure 67. Positioning the SFP or SFP+ Handle in the Upright Position
7. Connect the fiber optic cable to the transceiver, as shown in Figure 68.
The connector on the cable should fit snugly into the port, and the tab
should lock the connector into place.
Figure 68. Connecting a Fiber Optic Cable to an SFP or SFP+ Transceiver
8. Repeat this procedure to install additional transceivers.
S2/28
S1
/2
7
26
25
CON
SO
LE
SFP+
2678
SFP Handle
S2/28
S1
/2
7
26
25
CON
SO
LE
SFP+
2679
Zobrazit stránku 114
1 2 ... 110 111 112 113 114 115 116 117 118 119 120 ... 128 129

Komentáře k této Příručce

Žádné komentáře