Allied Telesis AT-FH708E Instalační příručka Strana 29

  • Stažení
  • Přidat do mých příruček
  • Tisk
  • Strana
    / 51
  • Tabulka s obsahem
  • KNIHY
  • Hodnocené. / 5. Na základě hodnocení zákazníků
Zobrazit stránku 28
AT-FH708E V2 Installation Guide
15
5. Attach the data cables to the ports on the hub.
Do not use crossover cables to connect
workstations or servers to ports 1 through 8.
Do not use a crossover cable to connect a
switch, hub, or router to the Uplink port.
Note
You can use either port 8 or the Uplink
port on an AT-FH708E V2 device. You
cannot use both ports simultaneously.
6. Go to the procedure “Verifying and
Troubleshooting the Installation on page 17.
Installing the Unit on a Wall
For wall-mount installation, you can position
the hub vertically or horizontally on the wall
using the keyhole cutouts in the bottom of the
hub chassis.
1. If previously attached, remove the rubber feet
and all cables and the DC power cord from the
hub.
2. Select a wall location for the hub.
Zobrazit stránku 28
1 2 ... 24 25 26 27 28 29 30 31 32 33 34 ... 50 51

Komentáře k této Příručce

Žádné komentáře