Allied-telesis x610 Series Layer 3 Uživatelský manuál Strana 41

  • Stažení
  • Přidat do mých příruček
  • Tisk
  • Strana
    / 128
  • Tabulka s obsahem
  • ŘEŠENÍ PROBLÉMŮ
  • KNIHY
  • Hodnocené. / 5. Na základě hodnocení zákazníků
Zobrazit stránku 40
Table 7. SFP+ Slot LED Descriptions
LED Function State Description
L/A Link Status
and Activity
Off No link has been established between
th
e port and the end node.
Solid
Green
The port has established a link at
10 Gbps.
Flashing
Green
Packets are being received or
tr
ansmitted at 10 Gbps.
Table 8. SFP Slot LED Descriptions
LED Function State Description
L/A Link Status
and Activity
Off No link has been established between
th
e port and the end node.
Solid
Green
The port has established a link at
1 Gbps.
Flashing
Green
Packets are being received or
tr
ansmitted at either 100Mbps or
1 Gbps, depending on the transceiver
inst
alled.
Solid
Amber
The port has established a link at less
th
an 1 Gbps.
Flashing
Amber
Packets are being received or
tr
ansmitted at less than 1 Gbps.
x610 Series Layer 3 Gigabit Ethernet Switches Installation Guide
41
Switches
Zobrazit stránku 40
1 2 ... 36 37 38 39 40 41 42 43 44 45 46 ... 127 128

Komentáře k této Příručce

Žádné komentáře