Allied-telesis AT-CV1203 Uživatelský manuál Strana 35

  • Stažení
  • Přidat do mých příruček
  • Tisk
  • Strana
    / 38
  • Tabulka s obsahem
  • KNIHY
  • Hodnocené. / 5. Na základě hodnocení zákazníků
Zobrazit stránku 34
AT-CV1203 Chassis Installation Guide
35
Verifying the Installation
After powering on the chassis, view the PWR GOOD LED. The LED
should be ON. The PWR A and PWR B LEDs should also be ON for DC
connectors that are connected to power adapters. If an LED is OFF,
perform the following:
Verify that the power cord is firmly connected to the AC power source
and to the power adapter.
Verify that the power adapter is firmly connected to a DC connector on
the back panel of the chassis.
Verify that the power source is operating properly by plugging a
different device into it.
Try connecting the power adapter to another power source, preferably
located on a different circuit.
Try using a different power adapter and power cord.
Check that the voltage from the power source is within the required
levels for your region.
For instructions on how to troubleshoot a problem with a line card, refer to
the documentation that ships with the card.
Zobrazit stránku 34
1 2 ... 30 31 32 33 34 35 36 37 38

Komentáře k této Příručce

Žádné komentáře