Allied-telesis 8100S Series Uživatelský manuál Strana 96

  • Stažení
  • Přidat do mých příruček
  • Tisk
  • Strana
    / 140
  • Tabulka s obsahem
  • ŘEŠENÍ PROBLÉMŮ
  • KNIHY
  • Hodnocené. / 5. Na základě hodnocení zákazníků
Zobrazit stránku 95
Chapter 6: Powering On and Verifying the Stack
96
Figure 40. Switch Initialization Messages (Continued)
At this point, the stack is operational and ready to forward network traffic.
Before connecting the network cables, go to “Verifying the Installation” on
page 101.
Note
After the stack becomes operational, the stack ID LEDs on the
master and member switches flash the ID numbers and code letter
“H” every few seconds. This is normal for the LEDs when the
switches are operating in a stack configuration.
Stack topology discovery is in process... Please Wait
Loading configuration file “boot.cfg” .... done!
Sending Configuration file to all slaves. Please wait...
00000001
Sending configuration file done!
Press <ENTER> key to connect...
New Switch 2 (00:15:77:99:99:91) is added into stack
Zobrazit stránku 95
1 2 ... 91 92 93 94 95 96 97 98 99 100 101 ... 139 140

Komentáře k této Příručce

Žádné komentáře