Allied Telesis Switch AT-SBXPWRSYS1 Uživatelský manuál Strana 143

  • Stažení
  • Přidat do mých příruček
  • Tisk
  • Strana
    / 222
  • Tabulka s obsahem
  • ŘEŠENÍ PROBLÉMŮ
  • KNIHY
  • Hodnocené. / 5. Na základě hodnocení zákazníků
Zobrazit stránku 142
SwitchBlade x3112 Installation Guide
143
5. Connect the fiber optic cable to the port on the transceiver, as shown
in Figure 99. The connector should snap into the port.
Figure 99. Attaching a Fiber Optic Cable to an SFP+ Transceiver in the
AT-SBx31XS6 Line Card
6. Repeat this procedure to install additional SFP plus transceivers in the
AT-SBx31XS6 Line Cards.
After installing and cabling the SFP+ transceivers, do one of the following:
To install and cable additional transceivers, go to the appropriate
section in this chapter for instructions.
After cabling all the ports in the chassis, go to Chapter 7,
“Powering On the Chassis” on page 153.
Zobrazit stránku 142
1 2 ... 138 139 140 141 142 143 144 145 146 147 148 ... 221 222

Komentáře k této Příručce

Žádné komentáře